ContractBeam
ContractOpen solicitation — bid to win the work10 days left

Markforged 3-D Printers

Point of contact

Before you bid: ContractBeam aggregates public government data and may lag the official record. Always confirm the scope, deadline, and submission instructions on the official source below before acting.

Related open opportunities

ContractNo Set aside used1 day left

Selective Laser Sintering Three-Dimensional Additive Manufacturing Machine

Amendment 0001 (A0001) to N0017326RTJ03 is hereby issued to accomplish the following: 1. Provide responses to questions received 2. All other terms and conditions Combined Synopsis Solicitation N0017326RTJ03 remain unchanged. ___________________________________________________________________________________________________ The Naval Research Laboratory is seeking quotes for a Selective Laser Sintering Three-Dimensional Additive Manufacturing Machine in accordance with the attached RFQ and Specifications document.

AgencyDEPT OF DEFENSE
NAICS333248
SAM.gov· Posted Jun 16, 2026#N00173-26-R-TJ03
ContractTotal Small Business Set-Aside (FAR 19.5)2 days left

13 ACSC 3D Metal Printer

Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with: Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards. Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting. All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026. marvin.e.hopkins4.mil@army.mil donelle.h.white.mil@army.mil jasper.l.cruz.mil@army.mil

AgencyDEPT OF DEFENSE
NAICS333248
PlaceFort Hood, TX
SAM.gov· Posted Jun 29, 2026#PANMCC-26-P-047957